Euroa Secondary College is the recipient of new classrooms under the Education Department’s Permanent Modular School Building Program. The Modular buildings are constructed offsite in modules, delivered to the schools and assembled on site.
Prior to the building allocation, Sectight conducted a comprehensive electrical services audit to determine maximum demand of the site, load sharing across all submains and location of all underground electrical services. Findings were provided to Sensum in a detailed report with site maps.
Sectight carried out all electrical and security works for the modular building at Euroa Secondary College for KLM Modular, including:
- Power upgrade to the entire school and new main switchboard
- Data, Phones, PA, Power and Security connection to the new building.
